Documents & Recording

Final plan submittals
Site Plan

Shall have owner and as applicable, engineer and surveyor signatures in black ink  

  • one (1) 11” x 17” reduced copy            
  • one (1) mylar
  • five (5) paper sets                               
  • one (1) .pdf file 
Subdivision

Shall have owner, engineer & surveyor signatures in black ink;

  • Submit mapping fees, payable to the Town of Milford; $30.00 per new lot 
  • Submit check payable to HCRD for recording fees
  • Submit the following for each plan set:

one (1) 11' x 17' reduced copy
two (2) mylars
five (5) paper sets
one (1) CAD file 

Easements or other documentation to be recorded* (with or without plans)

All documents shall:

  • Be signed in blue or black ink
  • Have a 3" margin at the top of the first page, and
  • Be accompanied by two checks payable to the HCRD: for recording fees and LCHIP Program fees. 

 ** Effective July 1, 2008 the State of New Hampshire has instituted a surcharge fee of $25.00 to fund the LCHIP program. The surcharge is due at the time of recording for all plans and deeds. The surcharge is not applicable to easements at this time. 

Links to HCRD